—— 工程技术服务 ——

我们提供各种客舱改装设计及DER, DOA批准服务。包含对营运飞机客舱客户化的设计,改装器材包准备,工程文件的编写,STC取证等。也可提供对退租飞机EEL,LOPA等文件的DER/DOA批准。

DER/DOA批准缩略图1
DER/DOA批准缩略图2
皮套翻新3缩略图

DOCUMENTATION LIST FOR DAR REVIEW

The Maintenance Program should be one that is approved by the country of use and should reflect the Manufacturer's Approved Program current content

The aircraft must be US Registered.

There must be a Notarized Power of Attorney designating an on-site Agent to be able to sign the appropriate FAA Applications for the Special Flight Permit, Airworthiness Certificate and Export C of A to what Country (?) on behalf of the Registered Owner.

But before DAR issue the certs, you must prepare documentation according to below list.

1. A complete list of all LLP items(airframe, engine, APU and landing gear) must be accompanied by "Back to Birth".

2. Documentation as well as an AD listing (airframe, engine, APU and components) showing method of compliance with "Dirty Fingerprint" proof and all documentation must be translated to English.

3. Hard Time Components should have an acceptable FAA Form 8130-1 or equivalent from an approved Vendor or Manufacturer. The total list should be available with last date and next due.

4. The AFM should be current and have an FAA Approved Supplement.

5. Installed Equipment including seats must be of a type approved by the FAA and meet the requirements of an FAA Approved LOPA for Configuration and Fire Protection/Blocking.

6. All Structure Mapping and Repair records, repair data will be requested, should be accepted by FAA.

7. Tally sheet for current workscope(last C-Check) showing planned workcards and all non-routine cards generated by the current inspection.

8. Copies of original Airbus export certifications (Airframe and Engine) and current aircraft certificates to assess the aircraft meets FAA Type Design A28NM. If there are any known exceptions to this design they need to be discussed ASAP.

There needs to be a letter from the Manufacturer that states in Part, At the time of manufacturer this aircraft S/N _____ meets the US Type Certificate A28NM. if it does not or did not meet the requirements of the TC then they need to list the deficiencies, typically they might be certified for 180 passengers vs 179 being the max allowed for the US Version. Depending on the age they might not have the correct over-wing exits or access to them. These are a few of the typical differences which have to be corrected prior to issuance of a Standard C of A. This requirement is specifically addressed in the US Type Certificate for the applicable model. Please be advised if ILFC did not obtain this letter from Airbus at time of purchase, they can obtain one, however, Airbus has recently required advance notice of several weeks to provide it, and may charge for it.

9. Same for installed engines. Export certificates copies if they are not the originally installed engines.

10. MPD status and Airworthiness (ALI) and CMR items compliance status.

11. Aircraft SB/modification(STC) and MOD status, if necessary, dirty figure should be supplied. Any installed STC's should also have FAA Approval.

12. Aircraft On-Wing Equipments list

13. Last shop visit/repair records of Engines, APU and Landing Gear

14. All Manual list with effective date

15. A/C check CRS copies and history.

16. AC log (utilization) and Engine LOG

17. ELA status and statement

18. DFDR analysis report

19. Last weigh report, compass swing report

翱银的每位顾问在民航业各个领域服务的年限均超过20年。都是经验丰富,善于沟通,专业知识过硬的中国民航精英。我们竭诚为各租机公司提供优质高效的技术服务。

退租顾问缩略图

翱银提供老旧飞机的销售

翱银可为老旧飞机的拆解提供专业的技术方案。

老旧飞机拆解方案1缩略图
老旧飞机拆解方案2缩略图


网站首页 |  关于我们 |  客舱MRO服务 |  航材贸易 |  工程技术服务 | 
RFID |  人才招聘 |  联系我们
联系人:李先生   电话:13640332074   传真:+86 (0)20 36977291  
邮件:sales@allinavitech.com   网址:www.allinavitech.com
地址:广东省广州市花都区雅瑶镇新雅街雅源中路2号楼
翱银航空技术有限公司 版权所有 2016-2025
粤ICP备16065312号